top of page
Blue Water

Goodwin Lake Slope Restoration

The Goodwin Lake project entailed the repair of erosion of the embankment and construction of a concrete stair-step spillway. Prince Edward Lake also required repair of embankment erosion, as well as construction of a concrete auxiliary spillway extension with a concrete plunge pool and rip-rap outlet channel.

Wooden Ceiling

Thompson Farmhouse Trusses

Truss and purlin installation for a private residence in Lake City, SC.

bottom of page